Site Event/Activity record ECH4130 - Scheduled Monument Consent

Please read our .

Technique(s)

Organisation

Department of National Heritage

Date

1994

Map

Description

SMC for the extension of pre-existing drainage arrangements fro the moat to carry away excess surface water which is creating a health hazzard in conjunction with the septic tank arrangements on the site. Works took place within areas of pre-existing ground disturbance.

Sources/Archives (1)

  • <1> Written Communication: English Heritage. Various. Scheduled Monument Consent Letter. Various.

Related Monuments/Buildings (2)

  • Field system at Bruera Moat (Monument)
  • Moated Site at Bruera (Monument)

Location

Location Bruera
Grid reference SJ 437 605 (point) Central Point
Map sheet SJ46SW
Civil Parish BUERTON, CHESTER, CHESHIRE WEST AND CHESTER

Record last edited

Mar 16 2006 2:52PM